Use scope words that describe the result

Full demolition removes the defined structure. Selective demolition removes chosen parts for renovation or system replacement. Mechanical demolition uses equipment for planned removal. Deconstruction takes selected assemblies apart to preserve material for reuse.

A project can combine these approaches. The right description says which areas and materials each approach covers rather than applying one label to the whole site.

Let the structure and surroundings shape the method

OSHA and California demolition rules require a structural survey before covered work begins. Framing condition, unplanned-collapse risk, adjacent structures, occupied areas, access, overhead lines, utilities, and debris movement all affect the sequence and equipment plan.

The demolition method should follow that review. It should not be selected from building size or equipment availability alone.

Separate hazardous material decisions from removal method

Mechanical, manual, and selective work can all disturb regulated material. Confirm asbestos, lead, universal-waste, and other material requirements before choosing what can be salvaged, recycled, or loaded as ordinary debris.

Qualified testing and abatement work should remain clearly separated from general demolition where the rules require it.

Ask bidders to explain the sequence

A proposal should connect the chosen approach to temporary support, utility control, public and neighbor protection, equipment access, debris handling, and the final site condition. Ask what would cause the method or price to change after work starts.

That sequence is the useful part of the answer. Method names alone do not show how the project will be controlled.

Check the current rules for your project.

Costs, permit steps, codes, disposal requirements, and site conditions change. Confirm current requirements with the responsible agencies and qualified professionals before work begins.